Gramercy Park Retrofit Full Bath to Powder Room
When our jobs extend beyond painting, we step right up to listen, understand, work and deliver what the homeowner specifies. Here we had a bathroom project which included removing a shower, walls and floor tiles at the outset. The homeowner wanted to convert a full bath into a half bath, while keeping the plumbing in place and shower body for reversing everything if a new owner wants to in the future.
Structo-Lite® Basecoat Plaster, a lightweight, insulated, basecoat gypsum plaster with thermal conductivity, was used to level the walls before installing new porcelain tiles. We installed and centered a new sink, plus mirror, lighting and toilet. It’s now a modern, sleek little half-bath with light industrial undertones.